PROPOSAL #2255 1/27/2005
back to home page (Sample – not a real document)
John Doe 859-555-5555
123 Ontheroadagain Dr.
Lexington, KY 40509
JOB DESCRIPTION: Bathroom remodeling. Work to include the following:
1. Remove old tub, vanity, and toilet.
2. Install new American Standard tub ($200 allotted), 36" vanity and top
($250 allotted for both),
chrome Delta vanity faucet model 1307, chrome Delta scald-guard model 1310,
and elongated
American Standard toilet with seat ($130 allotted).
3. Install new ceramic tile floor (12" tile and grout supplied by owner).
4. Remove all debris from site.
* D&S Construction warranties their workmanship for one year from the date of completion.
We Propose hereby to furnish material and labor --- completed in accordance with above specifications,Payment to be made as follows: 15% down, Friday draws, and final upon completion.
All material is guaranteed to be as specified. All excess materials at the
job site belong to the contractor.
All work is to be completed in a workmanlike manner according to standard
practices, and all applicable
federal, state, and local codes and regulations.
Acceptance of Proposal
--The above prices, specifications and conditions are satisfactory and are herebyOwner Signature Date of Acceptance
Agent Signature Date of Acceptance
Anticipated Start Date June 1st, 2005 Anticipated Completion Date June 10th, 2005
DRAW AMOUNT LEFT ON CONTRACT DATE CONTRACTOR SIGNATURE
#1 $1,275 $7,225
#2
#3
#4